Add a step before or after
What it does. Inserts an extra step into the job's route on the spot, released to the floor right away. Added steps are reviewed by the planner under Production Changes.
How to use it
Open the step, tap Add step before or Add step after, choose the work centre, and confirm.
F-0207 · checked against the live app